ZSpec NIR Harnesses & Connections#

Scope: the removable NIR assembly, including its EBox, cryostat, feedthroughs, cold wiring, YJ/H/K readout, external CRED2 slit viewer, and coldhead/compressor connections.

Related operations: ZSpec and environmental services. Diagrams: NIR assembly and mechanical-room connections.

Assembly boundaries#

  • NIR EBox: computer, network, motion/temperature controllers, AC/DC distribution, and heat exchanger.

  • Cryostat interior: cold-pupil rotator, ADC pair, field rotator, X/Y steering, slit selector, cold shutter, YJ/H/K detectors and focus stages, and thermal sensors/heaters.

  • Cryostat interfaces: support/motion VIB, detector VIB, vacuum gauge, and automatic gate-valve branch.

  • Outside vacuum: YJ/H/K Archons, CRED2 slit viewer, and enclosure temperature probes.

  • Cooling services: glycol manifold and coldhead; helium lines and vane-motor cable connect to the compressor/control equipment in the mechanical room.

Electrical patch panels#

VIS EBox to NIR EBox#

Connection

Service / medium

Detail

Power

NIR supply feed

From VIS EBox; supply arrangement is not yet selected

Network

NIR control and Archon links

Routing follows the VIS network choice

The mating panel is on the VIS EBox. NIR also needs power, network, and cooling for standalone AIT and maintenance, without the VIS assembly. Warm-side disconnects must allow NIR removal while VIS remains operational.

NIR EBox to cryostat and warm devices#

Connection

Harness / service

Support/motion VIB: mechanisms

Actuator and position-sensor wiring; cold-side connections

Support/motion VIB: thermal control

Temperature-sensor and heater wiring

YJ/H/K Archons

Power and network; detector harnesses run to the detector VIB

Enclosure probes

May use the NIR temperature controller for monitoring

The cryostat connections continue through the support/motion VIB. The CRED2 slit viewer remains outside vacuum.

EBox internal wiring#

Local AC/DC distribution powers the computer, controllers, hubs, and network electronics. Computer-to-controller/hub links are USB, Ethernet, or EtherCAT, according to controller selection. The NIR temperature controller connects to the local network.

Cryostat feedthroughs#

Support/motion VIB#

Warm-side connection

Cold-side equipment

Wiring

Motion controllers

Cold-pupil rotator, ADC pair, field rotator, X/Y steering, slit selector, cold shutter, YJ/H/K focus

Actuator and position-sensor wiring

Temperature controller

Thermal sensors and heaters

Sensor and heater circuits

Detector VIB#

Warm-side connection

Cold-side equipment

Wiring

YJ Archon

YJ detector

YJ detector harness

H Archon

H detector

H detector harness

K Archon

K detector

K detector harness

Detector temperature-sensor and heater wiring still needs a VIB assignment.

Cryostat internal wiring#

The support/motion VIB feeds the mechanism and thermal harnesses. The detector VIB feeds separate YJ/H/K detector harnesses.

Assembly

Drawing content

Support/motion VIB

Exterior connectors, feedthrough mapping, interior mechanism and thermal harnesses

Detector VIB

Exterior connectors, YJ/H/K channel mapping, internal detector harnesses

Internal harnesses

Vacuum-compatible assemblies, thermal anchoring, motion allowance, and accessible service breaks

Shutter triggers#

Shutter controller

Trigger inputs

Connection to shutter

NIR cold

Hardware OR of YJ/H/K Archon signals

Actuator wiring through the support/motion VIB

The OR circuit and shutter-position sensing connections still need definition.

Slit-viewer connections#

Camera

Location

Connections

Details still needed

NIR CRED2

Outside vacuum

Power, data, glycol

Supply, host/interface, and hose connections

Coldhead and compressor connections#

From

To

Service

Detail

Mechanical-room compressor

Coldhead

Helium lines

Line assemblies, route, and service breaks open

Compressor/control equipment

Coldhead

Vane-motor cable

Equipment connectors and route open

Cryo monitor

Cryogenic equipment / network

Monitoring and control

Signal allocation open

Compressor facility power and cooling are in the power and glycol harnesses.

Glycol connections#

From

To

Detail

ZFront glycol manifold

NIR distribution

Supply and return

NIR distribution

EBox exchanger, YJ/H/K Archons, CRED2

Branch layout open

Vacuum connections#

The NIR cryostat connects to a gauge and automatic gate-valve branch. The shared pump, manifold, and removable-NIR isolation connection are in the vacuum harness.

Team notes: The location and any glycol connection of the NIR coldhead need confirmation with the cryogenic design.