ZShooter Vacuum Harnesses & Connections#

Scope: four vessel branches, gauges, automatic gate valves, and the shared pump. Related operations: environmental services.

Diagrams: VIS detector assemblies and NIR assembly.

Assembly boundaries#

  • B/G/R detector vessels

  • NIR cryostat

  • Four gauge and automatic gate-valve branches

  • Shared roughing/turbo pump and manifold

Vacuum connections#

Vessel

Gauge

Isolation

Pump connection

VIS B

B vacuum gauge

B automatic gate valve

Shared pump; branch layout open

VIS G

G vacuum gauge

G automatic gate valve

Shared pump; branch layout open

VIS R

R vacuum gauge

R automatic gate valve

Shared pump; branch layout open

NIR

NIR vacuum gauge

NIR automatic gate valve

Shared pump; removable-NIR connection capped

Gauge placement, valve/manifold arrangement, fittings, and service connections remain open. Pump cooling is included in the glycol harness.

Electrical connections#

Equipment

Connection

Detail

Vessel gauges

Power and readout

Local host/controller connections open

Automatic gate valves

Local sensing, actuation, and position indication

Closes on power-loss

Shared pump

Power, local controls, status

Equipment selection and remote interface open

Automatic valve operation is independent of host software. The local protection connections and any host status interface will be shown in the assembly drawings.

Service connections#

Each vessel needs an isolation arrangement for servicing or removal while the retained vessels remain in use. Disconnects, caps/blanks, and pump-down connections will be assigned with the manifold layout.

Team notes: Automatic-valve logic, pressure thresholds, and the response to pump or valve-power loss remain open. The selected equipment and manifold arrangement will establish the pump-down and recovery procedures.