Budgets & Interfaces

This page is for the budgets and interfaces that are actually useful to keep in public or mixed-view technical sight: throughput, mass, services, interfaces, and similar working constraints.

Budget / interface

Status

Note

Optical throughput budget

TODO stage

Good candidate for public-facing technical content.

Detector / noise budget

TODO stage

Also good public-safe technical material.

Mass budget

TODO stage

Useful to team and observatory integration discussions.

Power / glycol / network services

TODO stage

Natural place for ICD-facing service summaries.

Observatory mechanical / optical interfaces

TODO stage

Keep this aligned with the working ICD, not with stale slide snapshots.

`Cost / FTE Budget`_ [internal only]